News
position :
Home > News
250 Ton Straddle Carrier
Long Term and Wider Range of VFD Electric Winch Partner from Thailand
Apr. 1st, 2016
On 14th, April. A Thailand customer contact us by Google search. The customer asked for a electric winch with hydraulic brake 8 to 10 Ton, Lifting speed adjust from 2 to 10m/min.
60 Ton 20 M Double Girder Gantry Crane
Export 60 Ton 20 M Double Girder Gantry Crane to Sri Lanka
Jan. 12th, 2016
Jan.12th,2016, Huada Heavy Industry exports two sets of Double Truss 60 ton 20 m Double Girder Gantry Crane to Sri Lanka.
Bridge Building Equipment
Set Up International Marketing Department-Expand bridge building equipment in Worldwide Market
Jan. 10th, 2016
Since the factory establishment in 2008, Huada Heavy Industry bridge building equipment has decided to go abroad. With the rise of “Belt and Road” wave, HDHI make the decision to set up independent international marketing department.
1800 Ton Segmental Launching Gantry
Highway and Railway Construction 1800 Ton Segmental Launching Gantry
Oct. 13th, 2015
Precast Segmental Method is a very popular way used for the construction of Highway and Railway with small curve and long span. On 10th Oct. We dispatch staff to the construction site to check the using situation of our 1800 Ton Segmental Launching Gantry and make site technical exchanges.
Rail Mounted Gantry Cranes Maintenance Principles
Sep. 9th, 2015
With the rapid development of modern logistics, construction, industry and machinery equipment, rail mounted gantry cranes are widely used in various fields. General rail mounted gantry cranes are very important engineering machinery.
Yard Gantry Crane
3 sets of Yard Gantry Crane for Kazakhstan client by Huada Heavy Industry is Being Produced.
Aug. 25th, 2015
In Mid-July, Kazakhstan client inquires about 10T yard gantry crane, one is used indoor and the other two are used on the street. After details confirmation for lifting capacity, lifting height, span and travelling length, Huada Heavy Industry provides customized solutions and offer for client.
Moving Overhead Crane
What should we pay attention to when moving an overhead crane?
Aug. 5th, 2015
Before moving the overhead crane, we should do: 1. Remove all loose material, parts, blockages and packaging from the load before lifting. 2. Before lifting the load, release any slack from the slings and hoisting ropes. 3. Make sure the lift is on the saddle of the hook. 4. Verify that the load will not exceed the maximum load capacity.
Material Handling Machines
Material Handling Machines
Jun. 22nd, 2015
Material handling machines encompasses a diverse range of tools, appliances and accessories involved in transporting, storing, controlling and protecting products at any stage of manufacturing, distribution consumption or disposal.
 8 9 10 11 12 13 14 15 
Inquiry
If you have any questions about our products, please contact us in time, we will reply to you the first time
Name :
* Email :
Tel :
Country :
* Messages :
Send
Reset
Top