project
Find What Suit to Your Project
Launching Gantry
position :
600 Ton 35 M Segment Launching Gantry with Span by Span Method
Segment Launching Gantry
Equipment Supplied: 600 Ton Capacity Segment Launching Gantry with Span by Span Method
Main Specifications: 35 M Span, 600 Ton
Year: 2017

600 Ton 35 M Segment Launching Gantry with Span by Span Method is used for the construction of YunZhan Expressway, now it is successfully completed the first span and following 12 spans’ fabrication.
Launching girder is the first step in the construction of the beam, is also a very important step. The design of our 600 Ton Capacity Segment Launching Gantry with Span by Span Method, considering the first step of the safety and smooth erection to the following spans paved the way for the smooth progress of the project also laid a solid foundation. It is designed and fabricated in order to ensure high performances, efficiency, safety, flexibility and multiple successive utilizations.
Work process:
feeding segments from bottom of LG→lifting the segments→hang→adjust the height→coating epoxy→accurate positioning→temporary prestressed tensioning→permanent prestressed tensioning→dismantle the suspender→finish assembly.
 
    related products
      Inquiry
      If you have any questions about our products, please contact us in time, we will reply to you the first time
      Name :
      * Email :
      Tel :
      Country :
      * Messages :
      Send
      Reset
      Top