900T Overhead
Movable Scaffolding System Bridge Construction
Capacity: 900T
Span: 32M
Maximum longitudinal slope: ≤3%
Maximum Transverse slope: ≤2.5%
Huada Heavy Industry has exported to Thailand contractor for 900T overhead movable scaffolding system (MSS) used for bridge construction.
This MSS production time is 3 months, customer come to visit production site, and to check for the assembly. Picture is our engineer to the client’s site to make installation guide and provide technical consultancy supervises for their operation.
The main structure of overhead movable scaffolding system (MSS) include Front Nose, Tension bars, Formwork, Transverse truss, Main Girder, Launching Wagon and Pier Support. All of these parts’ operation depends on the hydraulic drive and electrics system.
The overhead movable scaffolding system (MSS) can also easily be adapted to any bridge cross section (single box, double box, double T, etc.) and span configuration. This flexibility provides the contractor's equipment opportunities, which is also an important reason why contractor choose overhead MSS.