Long Line Method of Precast Segmental Bridge Girder Formwork
Huada Heavy Industry designs and export one set of precast segment bridge girder formwork to Colombia for highway bridge construction.
23th September, 2015, the precast segment bridge girder formwork were transported to the construction site. This design adopts the long line construction method. Our senior engineer and installation engineer arrive at the construction site for guidance on November 5 .
Long line method of precast segment bridge girder formwork:
Production methodology
Both elongation length and prestress force can be used to check that the correct stress levels are achieved. This cross-checking process ensures a safer, more controlled production process.
Efficiency
Long-line production generally uses less staff and materials.
Huada Heavy Industry Long-line method of precast segment bridge girder formwork with consistent quality and generally lower costs than the short-line method, and is generally more cost effective.